ETM 5.00% 1.9¢ energy transition minerals ltd

I would say that this is what the market picked up on in the...

  1. 2,955 Posts.
    lightbulb Created with Sketch. 484
    I would say that this is what the market picked up on in the presentation - no mention about the timing of the mining license. I guess until the EIA / SIA are closed out and the public hearings commence,we won't know for certain and the share price will reflect that- hopefully over the coming months we get more clarity!

    That being said, the presentation was excellent and it's full steam ahead and no turning back!

    "Q4 ‐ 2017  Updated Environmental Impact Assessment incorporating
    additional data and studies conducted through 2017
    Q1 ‐ 2018
     Project update drawing on test work conducted jointly with
    Shenghe through 2017; addresses optimisation and integration
    with downstream processing
     Commence update of Feasibility Study (2016)
    Q2 ‐ 2018
     Update operating costs
     Incorporate updated workforce requirements into SIA, conduct
    required EIA revisions that arise from optimisation
    Q3 ‐ 2018  Pilot plant operation of final configuration
    Q4 ‐ 2018
     Finalise Feasibility Study
     Revise capital costs"

    (Still a lot of work to do before production commences)
 
watchlist Created with Sketch. Add ETM (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
-0.001(5.00%)
Mkt cap ! $26.68M
Open High Low Value Volume
2.0¢ 2.0¢ 1.9¢ $8.621K 436.7K

Buyers (Bids)

No. Vol. Price($)
14 2024347 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 59055 1
View Market Depth
Last trade - 16.10pm 16/07/2024 (20 minute delay) ?
ETM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.