To reduce the energy operating cost and given the long project life , Maybe use solar for powering the bore pumps and the process plant during the day - good location for solar
- Forums
- ASX - By Stock
- Ann: INVESTOR PRESENTATION
To reduce the energy operating cost and given the long project...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $174.4K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online