Even fully staffed, we have a 7 yr mine plan with sub 1 g/t head grade. Plunging ore body with lots of thin lodes. Not much wiggle room for pit crews. Possibly why DR is keen as beans to get BS West drilled out. Even then, we'll need money for a camp, upgrade roads etc...
- Forums
- ASX - By Stock
- Ann: Investor Presentation
Even fully staffed, we have a 7 yr mine plan with sub 1 g/t head...
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable