OM Sarawak has a land holding of 500 acres, barely 50% of the area is currently utilized.
The current project is only at 66% of the original banking feasibility study from 2011.
Only 16 furnaces have been built compared to the 24 furnaces that were planned so only 66% of the project has been built.
Project Operating Equipment
The Project’s key operating capital equipment is anticipated to consist of:
- 24 sets of 25.5MVA submerged fully and semi enclosed arc furnaces and 1 set of 5MVA refining furnace with associated transformers, raw material feeding, casing/product handling and process control infrastructure,
- 1x36m2sinter strand with a capacity of 300,000tpa of manganese sinter ore, · 1 lime kiln with a capacity of 40,000 tonnes per annum,
- 2 rotary kilns (for raw material moisture management), · furnace de-dusting systems,
- a comprehensive waste heat recovery system, · compressed air plant,
- an approximately 4km long purpose built conveyor system connecting the smelter with the future Samalaju Port with a dedicated loading/discharging facility, and
- associated other buildings and infrastructure including water treatment plant, warehouses, workshops, laboratory and office buildings.
- Forums
- ASX - By Stock
- OMH
- Ann: Investor Presentation
Ann: Investor Presentation, page-69
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OMH (ASX) to my watchlist
(20min delay)
|
|||||
Last
44.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $340.9M |
Open | High | Low | Value | Volume |
44.0¢ | 45.0¢ | 43.5¢ | $15.59K | 35.46K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6523 | 44.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
46.5¢ | 1592 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6523 | 0.440 |
1 | 30921 | 0.435 |
1 | 4000 | 0.430 |
1 | 11767 | 0.425 |
1 | 1290 | 0.420 |
Price($) | Vol. | No. |
---|---|---|
0.465 | 1592 | 1 |
0.500 | 6130 | 1 |
0.565 | 11000 | 1 |
0.585 | 300 | 1 |
0.600 | 10000 | 1 |
Last trade - 15.59pm 28/06/2024 (20 minute delay) ? |
Featured News
OMH (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online