Definitely possible but remember DEL only have 50% interest in these projects. So it's going to take more than 2 fully operational projects to warrant that valuation and for sure no more dilution events.
There is scope for a regearing event which would mean both DEL and Palisade can extract equity from the projects to fund/recycle into the pipeline. But maximum value enhancement can only take place once derisked and operational. Regear during construction possible, but won't maximise value and a flawed strategy in my opinion.
Put the cashflow on a silver platter for the banks. Make it a no brainer.
Once VIC 1 and SA1 are fully operational the market should start to value the pipeline more seriously.
Alot of optionality should start to open up and optionality is valuable.
They just need to deliver on VIC 1 and SA1.
- Forums
- ASX - By Stock
- Ann: Investor Webinar Presentation
Definitely possible but remember DEL only have 50% interest in...
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.0¢ |
Change
0.010(7.14%) |
Mkt cap ! $33.04M |
Open | High | Low | Value | Volume |
14.0¢ | 15.0¢ | 14.0¢ | $85.06K | 579.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 97798 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 72218 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 97798 | 0.145 |
1 | 1800 | 0.140 |
6 | 213465 | 0.135 |
8 | 321432 | 0.130 |
5 | 277840 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 72218 | 2 |
0.155 | 108258 | 3 |
0.160 | 53606 | 2 |
0.165 | 107857 | 2 |
0.170 | 142047 | 3 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
DEL (ASX) Chart |