IVZ 4.23% 7.4¢ invictus energy ltd

Ann: Invictus Energy Secures Long Leads 2-Well Drilling Program, page-37

  1. 392 Posts.
    lightbulb Created with Sketch. 270
    Tomorrow is when the placement shares get released...

    You make it sound like 10c is impossible. However, those from the placement can sell at 10c for nil loss and have options for the run up to drilling...

    If anything if it goes to 3c, i'll be even happier, might take out a big margin loan and go all in.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.