40% savings on well costs.
He compared Mk1 and 2, in days per 1000m, and both wells were well under the average drill time from comparable wells elsewhere in Africa.
He said that shelf edge and out East wells should take ~ 14 days + evaluation.
Lets say 3500m drilling costs 35 million or 1 million per 100m - 40% = 21 million = 600k per 100m.
The shelf edge + eastern wells should cost ~ 10 million based on those numbers.
- Forums
- ASX - By Stock
- Ann: Invictus Energy Shareholder Briefing
40% savings on well costs.He compared Mk1 and 2, in days per...
-
- There are more pages in this discussion • 94 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.9¢ |
Change
0.003(4.55%) |
Mkt cap ! $97.83M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $269.3K | 3.995M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 482259 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 421552 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 482259 | 0.066 |
5 | 687240 | 0.065 |
3 | 216877 | 0.064 |
3 | 172538 | 0.063 |
3 | 265000 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 421552 | 2 |
0.070 | 482500 | 3 |
0.071 | 1035913 | 5 |
0.072 | 1040000 | 4 |
0.073 | 1060000 | 3 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online