IVZ 1.61% 6.3¢ invictus energy ltd

Ann: Invictus Spuds Maiden Oil & Gas Well in Zimbabwe, page-157

  1. 1,544 Posts.
    lightbulb Created with Sketch. 367
    haven't been reading all the posts as on holiday and there are a lot of posts so sorry if some has posted this before. My understanding is as follows taken from a recent presso. Any thought / corrections?

    -spud 24/9 - tick-
    -drill and Run In Hole (RIH)conductor to ~60m and cement to surface in place (assume complete)-
    -drill 17.5 inch hole to ~650-700m ( just above 200) (assume in progress)
    - run 13.38 Incan casing and cement to surface
    - wait on cement and BOP adjustment
    - drill out cement, casing shoe
    - adjust drilling fluid and get higher mudweight,,
    - perhaps they run a cement bond log?
    - Leak of Test respectively formation integrity test
    - perform kick drills and then drill slowly and carefully (because IVZ sees the risk of an overpressured 200 formation
    - drill through the 200 (complete 14-17 days from spud)
    - drill to base of 400 (~2200m) (10-15 days)
    - wireline logging (3-5 days)- so first definitive results ~ 27-37 days from spud
    - Case the first section (~ 7 days)
    - 8.5 inch hole through the pebbly arches to TD (~10 days)
    - wireline logging of bottom section (3-5 days)
    - results from bottom section
    ~50-60 days from spud
    - first results roughly 21-30 October
    - second results roughly 14-24 November
    - unless there is a kick then on for young and old.
    Last edited by huaneng: 30/09/22
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.3¢
Change
0.001(1.61%)
Mkt cap ! $89.32M
Open High Low Value Volume
6.2¢ 6.4¢ 6.0¢ $308.9K 5.008M

Buyers (Bids)

No. Vol. Price($)
1 160000 6.2¢
 

Sellers (Offers)

Price($) Vol. No.
6.3¢ 147648 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.