Per commsec:
"The largest incremental cost in the conversion of LiC to LiH is typically energy, including both power and heat. Ioneers cost to produce battery grade LiH from LiC will be materially lower than industry norms because of several factors:
Ideal quality, technical grade LiC produced in the main plant
Excess steam and power generated by sulphuric acid plant
High lithium recoveries do to recycle steam back into the main plant
A reduction in reagent costs achieved through the recycling of calcium carbonate back into the main plant"
Getting better and better!
- Forums
- ASX - By Stock
- Ann: ioneer Successfully Produces Battery Grade Lithium Hydroxide
Per commsec:"The largest incremental cost in the conversion of...
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add INR (ASX) to my watchlist
|
|||||
Last
14.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $354.6M |
Open | High | Low | Value | Volume |
14.5¢ | 15.3¢ | 14.5¢ | $559.4K | 3.741M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 1015078 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 816250 | 42 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
34 | 965331 | 0.145 |
26 | 2365685 | 0.140 |
23 | 1604068 | 0.135 |
26 | 1715076 | 0.130 |
10 | 705500 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 752541 | 40 |
0.155 | 925770 | 10 |
0.160 | 270931 | 8 |
0.165 | 129307 | 6 |
0.170 | 188637 | 7 |
Last trade - 11.54am 21/06/2024 (20 minute delay) ? |
Featured News
INR (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online