Bong work can commence once the pad is clear of all other works on Sail and the Blackdog production equipment install.
Its up to TB to book in a workover rig once Slawson are out of the way.
Ev's have come down to a level relative to our current Mcap.
Previous Ev's where around $220,000/ flowing barrel, if I can remember correctly. Less hype in the Oil and Gas space.