MGT 8.00% 40.5¢ magnetite mines limited.

Ann: Iron Peak Strengthens Razorback Project Economics, page-12

  1. 782 Posts.
    lightbulb Created with Sketch. 647
    this still doesn't leave enough buffer for commodity cycles, and stress tests such as current inflation and operating costs, labor, construction costs ect

    don't get me wrong it's still profitable 90% of the time under these current projections, but, we know from other operations just how detrimental the bottom line can be if these scale operations go into cars and maintenance. all the lithium miners found that the hard way
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
(20min delay)
Last
40.5¢
Change
0.030(8.00%)
Mkt cap ! $39.86M
Open High Low Value Volume
37.5¢ 40.5¢ 37.5¢ $110.6K 281.3K

Buyers (Bids)

No. Vol. Price($)
1 1500 40.0¢
 

Sellers (Offers)

Price($) Vol. No.
40.5¢ 10754 2
View Market Depth
Last trade - 16.10pm 28/05/2024 (20 minute delay) ?
Last
40.5¢
  Change
0.030 ( 8.00 %)
Open High Low Volume
38.0¢ 40.5¢ 38.0¢ 19287
Last updated 15.59pm 28/05/2024 ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.