IBG 0.00% 0.4¢ ironbark zinc ltd

Century Mine Project Overview Geology & Resources Restart...

  1. 9,592 Posts.
    lightbulb Created with Sketch. 792

    Century Processing Plant & Supporting Infrastructure

    The 7.0Mtpa capacity processing plant, in excellent condition after 16 years of use, is currently on care and maintenance following cessation of processing operations. Key equipment includes:
    • Primary crushing facilities, which reduce ROM feed to approximately 100mm;
    • Grinding facilities consisting of one SAG mill (12MW gearless drive) and two balls mills (8MW gearless drive & 6.7MW single pinion drive);
    • Milling facilities consisting of fifteen ultrafine sand mills (355kW);
    • A conventional froth flotation circuit, comprising 21 stirred mills and 79 flotation cells;
    • Remnant mobile fleet (reduced from original full scale operations) including 6 × Komatsu 630E dump trucks, 5 × Caterpillar D10/D11 dozers and 4 × Komatsu PC excavators;
    • Five exploration and grade control drilling rigs;
    • Full site laboratory capable of handling all exploration and plant samples; and
    • Equipment workshops and stores for all mobile and fixed plant maintenance. This gives an idea of the equipment required to build the Citeron Production Plant
 
watchlist Created with Sketch. Add IBG (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $6.375M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $4.833K 1.208M

Buyers (Bids)

No. Vol. Price($)
4 2117531 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 5429982 9
View Market Depth
Last trade - 15.05pm 21/06/2024 (20 minute delay) ?
IBG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.