Column 1 Column 2 0 News AlertA new article has been posted to our website.To view the article, please click on the link below.
Isabel Nickel Project resource definition drilling update
Axiom has completed 364 holes and approximately 4500m of drilling in the current resource definition drilling program.
Latest drilling results with high grade saprolite intersections include:An additional result with both high grade limonite and saprolite intersections:
- 15.8m @ 1.87% Ni from 1.0m including 11.0m @ 2.29% Ni from 5.0m
- 15.0m @ 1.49% Ni from 1.0m including 9.3m @ 1.92% Ni from 5.7m
- 10.0m @ 1.63% Ni from 1.0m including 8.0m @ 1.85% Ni from 3.0m.
Phase 1 of resource definition drill program (total of 5000m) is due to be completed this week.
- 17.2m @ 1.48% Ni from 1.0m including 4.0m @ 1.58% Ni from 5.0m (limonite) and 8.0m @ 1.82% Ni from 9.0m (saprolite).
Ann: Isabel Nickel Project resource definition drilling update, page-2
Add to My Watchlist
What is My Watchlist?