CTM 3.00% 48.5¢ centaurus metals limited

It won't let me copy some of it so can't translate it but below...

  1. 138 Posts.
    lightbulb Created with Sketch. 34
    It won't let me copy some of it so can't translate it but below is what I could translate,


    The RIMA - Environmental Impact Report aims to present to the community, in a simplified way, the
    information regarding the Jambreiro Project, which were treated with due technical depth in the Study
    Environmental Impact – EIA, presented for analysis by the environmental agency in the environmental licensing process.
    This RIMA, prepared in a summarized and didactic way, presents the main characteristics of the proposed project, the
    environmental characteristics of the area where the structures may be installed, the main environmental impacts
    expected and the environmental actions that were defined so that the environment has its environmental quality
    maintained.
    two
    The RIMA - Environmental Impact Report aims to present to the community, in a simplified way, the
    information regarding the Jambreiro Project, which were treated with due technical depth in the Study
    Environmental Impact – EIA, presented for analysis by the environmental agency in the environmental licensing process.
    This RIMA, prepared in a summarized and didactic way, presents the main characteristics of the proposed project, the
    environmental characteristics of the area where the structures may be installed, the main environmental impacts
    expected and the environmental actions that were defined so that the environment has its environmental quality
    maintained.
    PROJECT PURPOSE AND RELEVANCE
    3
    The main objective of the Jambreiro Project is the production of
    iron ore concentrate. The studies carried out
    so far they predict the production of up to 3 million
    tons of iron ore annually,
    predicting the useful life of the iron ore deposit
    for approximately 18 years.
    Relevant Aspect of the Quantification Project
    Ore volume of the deposit 77 million tons
    Investment BRL 350 million
    CFEM* R$ 8.16 million/year (60% for São
    John the Evangelist)
    Estimated useful life 18 years
    Jobs during the
    implantation
    1,170 jobs on average, 1,500
    at the peak of construction
    workstation during the
    operation
    400 jobs
    The implementation of the Jambreiro Project will contribute to reduce the vacancy rates of the municipalities of São João Evangelista and Guanhães, to heat up the economy of the region due to the generation of direct jobs and indirect associated with the provision of services, mainly in commerce, in addition to demanding Providers.

    The Jambreiro Project will have the infrastructure existing road in the region, due to the presence of industrial-scale planting of eucalyptus. Also, because it is located in an area of eucalyptus monoculture, will imply in lesser amount of vegetation clearing Natural.

    Project Jambreiro comprises an iron mine, three waste/waste disposal piles, one water accumulation dam, a power plant wet processing, in addition to facilities for support for the operation of the enterprise.

    MENT
    12
    GENERAL ARRANGEMENT OF OPERATING STRUCTURES
    Activities planned during the operation of the Jambreiro Project:
    mining of ore
    ▪ Rock blasting;
    ▪ Excavation;
    ▪ Truck loading;
    ▪ Transport of ore to primary crushing; and
    ▪ Transport and disposal of sterile piles;
    Ore processing
    ▪ Crushing;
    ▪ Screening;
    ▪ Milling;
    ▪ Concentration;
    ▪ Thickening;
    ▪ Drying; and
    ▪ Transport and disposal of waste in a pile;

    CHARACTERIZATION OF THE ENTERPRISE
    13
    STERILE / WASTE DISPOSAL
    The sterile coming from the mining fronts and the tailings to be dewatered at the processing plant will be disposed of in the form of piles, in three (3) deposits, called North, East and South.
    The area and final volume (at the end of the useful life of the development) of each of the sterile/tailing piles are presented in the table below:
    Stack (PDE) Area (ha) Volume (Mm³)
    North 26.34 9.87
    East 51.11 24.15
    South 22.91 9.16
    Total 100.36 43.18
    WATER DAM
    After review and technological update of the Project Jambreiro, the tailings dam was excluded from its layout with an area of 198ha.
    In this new redesign, the project will have only with a water dam (reservoir), significantly smaller, with an area of 15 hectares, with storage capacity of 481,000m³.
    The massif of this structure will feature systems of internal/external drainage, spillway, and for protection of the slopes, a transition is planned consisting of blocks of rock (rockfill) and gravel.
 
watchlist Created with Sketch. Add CTM (ASX) to my watchlist
(20min delay)
Last
48.5¢
Change
-0.015(3.00%)
Mkt cap ! $240.0M
Open High Low Value Volume
49.0¢ 50.5¢ 48.0¢ $187.9K 378.5K

Buyers (Bids)

No. Vol. Price($)
2 95452 48.0¢
 

Sellers (Offers)

Price($) Vol. No.
48.5¢ 3438 3
View Market Depth
Last trade - 13.22pm 22/05/2024 (20 minute delay) ?
Last
48.0¢
  Change
-0.015 ( 3.32 %)
Open High Low Volume
49.0¢ 50.5¢ 48.0¢ 71714
Last updated 15.48pm 22/05/2024 ?
CTM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.