some calcs:
zn 1431
lead. 357x0.9. 320
copper. 860x3= 2,580
total zn equal. 4,311tons zn equiv
4,311x 2000 (lbs per ton) =8.6m p/quarter @$1 us a ton
3 equal quarters say $26m.
assume usd/aud is contingcy for any reduced production and $1m for error rate.
$25m for the quarter less $23m run cost; $2m surplus for the quarter ie ~$13m cash reserve end of quarter.
anything wrong with the math shout out.
- Forums
- ASX - By Stock
- RVR
- Ann: January 2020 Production Update
Ann: January 2020 Production Update, page-19
-
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)