Hi tjsol
my read on things is this was part of a trial to optimize blend to through put / with head grade/recovery .
it seems they are extremely happy with the through put and recover at 86% by memory this is a healthy, happy balance ,
This would allow us to mine the low grade at Jaurdi that was not economically viable to mine and process alone. in a early podcast it was mentioned we are sitting on a lake of it, at very low cost mining.
So all we need is the 30% of a higher grade to keep that head grade constant at this level so we can blend with it to produce the numbers reported.
My thoughts from this report we have a unconfirmed 10 years
If we put high-grade through at the rate that you are suggesting we would loose a great deal to tails meaning our recovery is reduced So we would have to upgrade the plant to achieve your numbers . .
i am hoping the gravity circuit will come into significance in the way of taking some of the load off the leaching circuit and recovery will increase unless this is in use now and aiding with these numbers
These are are only my thoughts
- Forums
- ASX - By Stock
- Ann: Jaurdi Gold Project December Quarter Production Update
Hi tjsolmy read on things is this was part of a trial to...
-
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
0.001(4.55%) |
Mkt cap ! $86.40M |
Open | High | Low | Value | Volume |
2.3¢ | 2.3¢ | 2.2¢ | $89.54K | 3.923M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 5220096 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 2791111 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 5220096 | 0.022 |
11 | 3414353 | 0.021 |
7 | 4139507 | 0.020 |
2 | 46368 | 0.019 |
2 | 188000 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 2791111 | 8 |
0.025 | 1441945 | 3 |
0.026 | 621970 | 3 |
0.027 | 949333 | 3 |
0.028 | 2146150 | 1 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
BCN (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online