BCN 3.57% 2.7¢ beacon minerals limited

Ann: Jaurdi Gold Project July Production Update, page-3

  1. 1,095 Posts.
    lightbulb Created with Sketch. 883
    Decent update:

    • Exceeded guidance on oz produced by 4.6%
    • Exceeded nameplate on milled tonnes by 2.7%
    • Realised receipts for 2222 oz at average $2509 vs perth mint average of $2612 (-$228,866)
    • Recovery up to 89.8% vs 85% nameplate (+5.6%)

    Consider the ship steadied after small hiccup last month.
 
watchlist Created with Sketch. Add BCN (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
-0.001(3.57%)
Mkt cap ! $101.4M
Open High Low Value Volume
2.7¢ 2.9¢ 2.7¢ $44.32K 1.610M

Buyers (Bids)

No. Vol. Price($)
4 3424659 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 61777 1
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
2.7¢
  Change
-0.001 ( 3.57 %)
Open High Low Volume
2.8¢ 2.8¢ 2.7¢ 472353
Last updated 15.49pm 07/06/2024 ?
BCN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.