just revisiting this. I think the Butterfly Lake area looks good, will be great when the fieldwork gets done and outcropping pegs are eyeballed and chipped. Potential issues, but not deal breakers, will be 1) the Indigenous lands covering parts of these areas, particularly to the south and east of Spod Island, however they are miners (Cross Lake Mineral Explorations Inc) and are trying to start a Fe-Ti-V mine at Pipestone lake (you can see the mining leases and drilling in the regional mag pic above) so will be approachable for deals should favourable geology stray into their territory, 2) lakes, which apparently are not that big a deal in Canada, and much of the project area is dry. The dike mag low that runs past the eastern edge of Butterfly lake and through the felsic-mafic contact, shown to be fertile to the west, is where I would be looking for starters in the new tenements. In particular, this rocky terrain 3km in length:
which is located here with all the so-called 'Goldilocks' features for mineralised pegs, if my understanding is correct.
tell me if i'm just leading myself astray
- Forums
- ASX - By Stock
- LM1
- Ann: Jenpeg High-Grade Lithium Project Tenure Increased by 130%
Ann: Jenpeg High-Grade Lithium Project Tenure Increased by 130%, page-9
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LM1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.794M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 6.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 6530 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.060 |
1 | 13160 | 0.038 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 6530 | 1 |
0.110 | 81000 | 1 |
0.120 | 84500 | 2 |
0.140 | 58909 | 1 |
0.180 | 50000 | 1 |
Last trade - 16.12pm 15/10/2024 (20 minute delay) ? |
Featured News
LM1 (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online