I am not persuaded that this mine has legs. It is limited life, low grade, 2 x open pits and 2 x inclines therefore hard to get efficiencies. It has no services and so everything has to be trucked in or generated on site. The first Feasibility Study understated costs and the second Feasibility Study was not well accepted by the Board. Hence CEO left the business as did Flagstaff; the project managers who were running the study.
Just because it is copper is not enough to underpin its success in my opinion.
Caveat emptor
- Forums
- ASX - By Stock
- Ann: Jervois Copper Project - Feasibility Study
I am not persuaded that this mine has legs. It is limited life,...
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.0¢ |
Change
0.015(13.0%) |
Mkt cap ! $73.74M |
Open | High | Low | Value | Volume |
12.0¢ | 13.0¢ | 12.0¢ | $13.20K | 108.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 41000 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 816666 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 41000 | 0.115 |
8 | 453080 | 0.110 |
3 | 164757 | 0.105 |
5 | 337420 | 0.100 |
1 | 5107 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 816666 | 2 |
0.140 | 251088 | 2 |
0.160 | 42000 | 2 |
0.170 | 15966 | 1 |
0.175 | 26315 | 1 |
Last trade - 16.10pm 17/05/2024 (20 minute delay) ? |
|
|||||
Last
12.0¢ |
  |
Change
0.015 ( 4.00 %) |
|||
Open | High | Low | Volume | ||
12.0¢ | 12.0¢ | 12.0¢ | 15038 | ||
Last updated 14.59pm 17/05/2024 ? |
Featured News
KGL (ASX) Chart |