GGE 0.00% 0.5¢ grand gulf energy limited

This Party has just begun....... Watch this space...LOL● only 1...

  1. 600 Posts.
    lightbulb Created with Sketch. 291
    https://hotcopper.com.au/data/attachments/5838/5838180-e376faa348e0caf5ed7f768b52b0ce35.jpghttps://hotcopper.com.au/data/attachments/5838/5838181-4179e203ae76532894c4fc3763841b5d.jpg

    This Party has just begun....... Watch this space...LOL

    ● only 1 level of the Helium Reservoir has had limited workover work done to this section.
    ● Proper Well Simulation has not been done yet .
    ● Jesse-1A has been cap for 20 months with a significant flow rate resulting of 1 Mmcf/ day flow rate with only limited workover procedure done on the well .
    ● No significant rock disintegrating acid wash Simulation workover work has been done yet on Jesse- 1A well.
    ● IMO ...once Halliburton, (Who are The Best Oil and Gas Experts in the World ), finalise proper Stimulation workover on Jesse- 1A well in 2024 , it could achieve significant Flow rates in excess of
    15 to 20 times the current 1Mmcf/ day Flow Rates Jesse-1A has currently....?

    DYOR
    GLTALSH
    256lith
 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $10.47M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $450 90.00K

Buyers (Bids)

No. Vol. Price($)
18 5655651 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 1443905 1
View Market Depth
Last trade - 13.51pm 31/05/2024 (20 minute delay) ?
Last
0.5¢
  Change
0.000 ( 16.7 %)
Open High Low Volume
0.5¢ 0.5¢ 0.5¢ 350000
Last updated 13.10pm 31/05/2024 ?
GGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.