eyes on the prize folks.
Red line up to is the length of the Paradox Field. Lisbon Gas plant is halfway across the Paradox field, to the south.
The red line below is a line from Jesse 1 to Jesse 2. The GGE lease area goes from Monticello all the way to the border I think.
- Forums
- ASX - By Stock
- Ann: Jesse-1A Operations Commence
eyes on the prize folks. Red line up to is the length of the...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.801M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1981095 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 6007208 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1981095 | 0.004 |
17 | 14945229 | 0.003 |
12 | 7650009 | 0.002 |
11 | 62700009 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 6007208 | 15 |
0.006 | 1813015 | 2 |
0.007 | 761000 | 2 |
0.008 | 666760 | 2 |
0.010 | 200199 | 1 |
Last trade - 16.12pm 27/09/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |
Day chart unavailable