i could speculate on the SP but im not going to. Instead i will post my figures for production up to tomorrow 10/11/21 4 weeks since last update.
Production figures based on reaching 2014 BOEPD Tomorrow, OIL 61507 barrels, Gas 19849 barrels, NGLs 27814 barrels
Works out to be $4,613,096 USD Oil, $595,482 USD GAS, $1,056,950 USD NGLs at $75 $30 $38 Thats $6,265,529 USD or $8.3M AUD at 0.75c in total Production.
Even If the Production didnt increase from the 1727 BOEPD and just stayed the same i still get $5.89M USD or 7.85M AUD in total Production less costs
Early next year SHE are going to have massive CASH
Anyone else charting cash flow ?
- Forums
- ASX - By Stock
- Ann: Jewell Production Now Tracking Above Pre-Drill Estimate
i could speculate on the SP but im not going to. Instead i will...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SHE (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.213M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $1.2K | 100K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 400000 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 200000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 400000 | 0.012 |
7 | 4054545 | 0.011 |
3 | 725000 | 0.010 |
1 | 750000 | 0.009 |
1 | 120000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 200000 | 1 |
0.014 | 1510000 | 2 |
0.015 | 2475252 | 6 |
0.016 | 1241666 | 2 |
0.017 | 1687510 | 2 |
Last trade - 13.55pm 03/05/2024 (20 minute delay) ? |
Featured News
SHE (ASX) Chart |