You obviously don't have a clue, do you?
How much power will the manganese battery material operation take?
Most HPEMM projects quote 6500kWh of power required, thats only for production not for excavation or pumping etc.
at the current power price in Czech Republic the cost to produce one tonne = 6,500kWh x 6.27CZK/kWh = 1,660 Euro/tonne in power cost alone.
You're definitely on drugs if you think a cost of 1,660 Euro /tonne in Czech Republic can compare with a cost of US$230/tonne in Asia.
Dream on.
- Forums
- ASX - By Stock
- Ann: JORC Code - Feas. Study Effective Date 27-07-2022
You obviously don't have a clue, do you? How much power will the...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.04M |
Open | High | Low | Value | Volume |
7.1¢ | 7.1¢ | 6.9¢ | $2.786K | 39.91K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 918 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.3¢ | 300670 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 783434 | 0.068 |
2 | 258200 | 0.067 |
4 | 259567 | 0.066 |
4 | 42000 | 0.065 |
3 | 91250 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.073 | 300670 | 2 |
0.075 | 12720 | 1 |
0.076 | 20500 | 1 |
0.078 | 26666 | 1 |
0.079 | 15358 | 2 |
Last trade - 14.38pm 12/07/2024 (20 minute delay) ? |
Featured News
EMN (ASX) Chart |