BEZ 0.00% 10.5¢ besra gold inc.

These images of some of the equipments of the pilot plant are...

  1. 2,960 Posts.
    lightbulb Created with Sketch. 4334
    These images of some of the equipments of the pilot plant are truely impressive. Look at the image of the Ball Mill. It is giant.

    This puts Besra miles ahead of other gold explorers with MC of $200mil-$400mil. Anyone of them lucky enough to prove up 1.5mil oz or above (Besra = 3mil oz with 4.9mil oz - 9.3mil oz Exploration Target) in the next few years will still have to go through the lengthy process of pilot plant permit, pilot plant design and scale, pilot plant ordering, and 1-2 years of waiting for equipments to be manufactured and shipment and construction.


    Besra is miles ahead of them.

    Next move after pilot plant: investigation of early mining of 100k oz in the historical tailing area to bring in nice juicy early cash sum for the ultimate 3mil oz gold mining.

    100,000oz × USD $3000 projected gold price in 2025 ÷ 0.68 AUD/USD = AUD $440mil early revenue to put into CAPEX for the 3mil oz mining operation.

 
watchlist Created with Sketch. Add BEZ (ASX) to my watchlist
(20min delay)
Last
10.5¢
Change
0.000(0.00%)
Mkt cap ! $43.90M
Open High Low Value Volume
10.5¢ 12.0¢ 10.3¢ $319.6K 2.848M

Buyers (Bids)

No. Vol. Price($)
5 39260 10.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 45000 1
View Market Depth
Last trade - 16.10pm 19/08/2024 (20 minute delay) ?
BEZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.