STX 2.17% 22.5¢ strike energy limited

Ann: June 2016 Quarterly & Appendix 5B-STX.AX, page-2

  1. 1,506 Posts.
    lightbulb Created with Sketch. 14
    All progressing to plan IMO .   Good to see another off take agreement is well advanced and its steady as she goes. Rex, HC and PSI over to you for what is now a well tuned SME insight

    We have seen a substantial improvement in productivity at Klebb 3 following the
    pump upgrade indicating the potential for a higher peak gas flow rate and EUR to
    be achieved from this well. We intend to replicate this upgrade at Klebb 2 during
    August.
    The commissioning and operation of the electric submersible pump (ESP) at Klebb 4,
    completed post quarter end, has been successful. The pump is operating stably and
    we are in the process of working to achieve a gradual reduction in reservoir pressure.
    Consistent with the early performance of the other Klebb wells, gas flows at surface
    have been observed.
    The real time down hole pressure and rate data we obtain from the ESP has been a
    revelation that has allowed more precise operating control as the well approaches
    critical pressure transition points.
    The demonstrated combination of stable production performance, improved data
    flow and operating control at Klebb 4 has validated the fracture stimulation / ESP
    completion as a feasible and effective development pathway for the project
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
-0.005(2.17%)
Mkt cap ! $643.6M
Open High Low Value Volume
23.0¢ 23.0¢ 22.0¢ $1.581M 7.009M

Buyers (Bids)

No. Vol. Price($)
18 840004 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 639041 6
View Market Depth
Last trade - 16.10pm 03/07/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.