    RECENT DRILLING RESULTS
    Holes MTD025 and MTD026 (EIS2) were completed during the quarter (ASX, MTD025 Extends Nickel
    Mineralisation, 17 April 2023; Completion of MTD026 and Upcoming MobileMT Survey, 27 June 2023). Drilling
    of the next hole MTD027 is ongoing and is currently at around 1,150m depth.
    Hole MTD025 was designed to test a DHEM geophysical anomaly and follow-up on Phase 1 hole MTD018. The
    DHEM survey identified a strong (~5,000-15,000S) shoot-like offhole anomaly.
    MTD025 intersected a ~446m thick package of high MgO adcumulate dunite ultramafic. Two shallow intervals of
    disseminated magmatic sulphides (trace to 1%) were seen in the top 200m of the hole, in a similar zone to that
    seen in previous holes MTD012, MTD022 and MTD023.
    Hole MTD026 (EIS2) was located approximately halfway between holes MTD023 (EIS1) and MTD020. Both of
    these holes showed extensive intersections of disseminated sulphide mineralisation, with hole MTD020 being
    the first significant occurrence during the Phase 1 drilling program (ASX, Disseminated Sulphides Seen Over
    300m in Hole MTD020, 26 July 2022; MTD020 Assays Confirm Extensive Working Mineral System, 7 November
    2022). The hole attempted to test the footprint of mineralisation across the body of the Complex and was drilled
    with the aid of WMG’s EIS award (ASX, WMG Wins $220,000 EIS Award to Drill Mulga Tank, 17 October 2022).
    Hole MTD026 was drilled to a total depth of 1,548.3m and intersected ~1,400m of variably serpentinised and
    talc-carbonate altered high MgO adcumulate to extreme adcumulate dunite ultramafic (60.2-1,469.7m), beneath
    60.2m of sand cover (0-60.2m), before encountering a footwall of predominantly basalt and silicified shales at
    1,479.7m depth (1,469.7-1,548.3m).
    The dunite was divided by an approximately ~38m thick dolerite unit (749-787.3m) that most likely represents a
    later dyke/sill. This dolerite unit was seen at a nearly identical depth and thickness in hole MTD023.
    Disseminated magmatic sulphides (trace to 2%) were observed down the majority of the hole, starting from
    around 117m depth. In a number of places the disseminated sulphides coalesced into interstitial blebs (3 to 5%
    sulphide) between former olivine crystals and also approached net textured (5 to 10% sulphide).
    Multiple intersections of high-tenor remobilised massive nickel sulphide blebs and veining were also observed
    down the length of the hole with these appearing to increase in frequency towards the basal contact of the
    Complex (Figure 2). This interesting observation, in a new previously undrilled area, supports the potential for
    multiple massive sulphide sources or deposits within the Complex (Perseverance-style basal massive sulphide)
    and not just limited to the Western Margin where previously encountered.
    Overall hole MTD026 shows a number of similarities with the first EIS deep hole MTD023 (~1km to the NW) but
    it appears to contain a much “richer” disseminated sulphide content and remobilised massive sulphide veinlets
    down the hole (Figure 2).
    CURRENT HOLE
    Drilling of hole MTD027 (planned hole MTP026) on the eastern margin of the Mulga Tank Complex is still in
    progress and is currently at a depth of around 1,150m.
    The hole was designed to test a coincident gravity and magnetic high, and minor MLEM anomaly, as well as for
    the presence of nickel sulphide mineralisation in an area of the Complex that has had no previous drilling. The
    hole was anticipated to intersect the footwall of the intrusion at around 750m, based on the Company’s lopolith
    shaped geological model of the main body, but the drilling so far appears to show the eastern margin of the
    Complex is much steeper dipping than the western margin.
    The Company will update shareholders on the results of this hole once it is complete.

    IDKA
    IMO
    DYOR
 
watchlist Created with Sketch. Add WMG (ASX) to my watchlist
(20min delay)
Last
23.5¢
Change
0.000(0.00%)
Mkt cap ! $20.01M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 10000 26.0¢
 

Sellers (Offers)

Price($) Vol. No.
25.5¢ 3139 1
View Market Depth
Last trade - 12.50pm 16/09/2024 (20 minute delay) ?
WMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.