    Steady drilling infill. Diamond and probably a sonic rig both of which are not necessarily as quick as RC but likely give better sample return.
    Over the last 5 days 4 holes appear to have been drilled or completed. One begun before this period and perhaps last one not finished yet.

    https://hotcopper.com.au/data/attachments/6329/6329213-02115a974ab1ffa04da54bac81370dc0.jpg
    Pink 2024 prepared sites, large white drilling in period, black in 2024, white drilled 2023, green prepared 2023 not drilled yet.

    In the past I have said there is 50m spaced drilling but this is not correct.

    A majority of the black dots (2024 drilling interp; in the above image) are actually 50m offset 100m lines. Don't know quite what to call this spacing but looks like it will give a good coverage with less than full on 50x50m coverage. The latter would increase the number of holes and meters significantly.

    https://hotcopper.com.au/data/attachments/6329/6329227-e0ba74a1c856d7e8a1f16fc7be190d4e.jpg

    Another observation is there is nearly always some subtle activity around the X. Not too clear what it is. Diamond Drill activity perhaps.

    https://hotcopper.com.au/data/attachments/6329/6329231-129ac57c24520c39a085610e3e7912ec.jpg

 