COE 0.00% 22.0¢ cooper energy limited

Ann: June Quarter Report Conference Call details, page-10

  1. 253 Posts.
    lightbulb Created with Sketch. 55
    I’m assuming the absorbers can’t handle the total input flow while in series. But they expect they will handle half the input flow each while in parallel. In the case of a shut down or damage to one of the absorbers in parallel, maybe the other can handle for a short time at full input flow or the input will need to be scaled back while the other is repaired. At least the plant is still operational and doesn’t need to be fully shutdown in this situation.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
0.000(0.00%)
Mkt cap ! $580.8M
Open High Low Value Volume
22.0¢ 22.5¢ 21.5¢ $978.1K 4.441M

Buyers (Bids)

No. Vol. Price($)
5 446242 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 17869 1
View Market Depth
Last trade - 16.10pm 18/07/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.