JPR 0.00% 3.0¢ jupiter energy limited

Ann: Jupiter completes coring middle triassic in , page-2

  1. 18,150 Posts.
    lightbulb Created with Sketch. 2
    re: Ann: Jupiter completes coring middle tria... JUPITER COMPLETES CORING MIDDLE TRIASSIC IN J‐50 OIL
    DISCOVERY WELL
     J‐50 has completed coring in the Middle Triassic reservoir.
     J‐50 well has reached 3059m and is currently drilling ahead to total depth.
     120m of Middle Triassic reservoir section has now been intersected as per
    prognosis
    Operations on the J‐50 well have continued with acquisition of a total of 54.3m of
    conventional core in the Middle Triassic reservoir. Core #6 has been recently acquired from
    interval 3030m to 3039mRT and 100% has been recovered from the core. Hydrocarbon
    shows and gas returns were evident through most of this core run. Coring operations have
    now ceased and drilling activities have resumed.
    The J‐50 well intersected the top of the reservoir at 2939mRT and a total of 120m of Middle
    Triassic reservoir section has been intersected to date.
    At 1200 hours on 8th April, 2010, the current operation on the J‐50 well was drilling ahead in
    Middle Triassic limestones and claystones at 3059m.
    The future activity plan is summarised as follows:
     Drill to total depth (~3250mRT)
     Run extensive electric wireline logging suites across the zones of interest.
     Run and cement production casing.
     Run completion and clean up well.
     Release rig and commence 90 day production test.
    Shareholders will continued to be informed with the release of the weekly drilling updates
    as well as additional information as drilling of the reservoir section continues.
    ENDS
 
watchlist Created with Sketch. Add JPR (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
0.000(0.00%)
Mkt cap ! $38.20M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 56685 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 2373 1
View Market Depth
Last trade - 10.22am 11/07/2024 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.