LKE 5.08% 6.2¢ lake resources n.l.

Cauchari project has a higher concentration level that kachi...

  1. 230 Posts.
    lightbulb Created with Sketch. 43
    Cauchari project has a higher concentration level that kachi which I was hoping for lake to develop first.

    Olaroz Brine Project
    20 to 30km belt adjoins Orocobre Production & SQM/LithiumAmericas Development Project
    Targeting same aquifers – alluvial covered targetMost advanced lithium brine projects are extendingresource under cover on basin margins (listed in a lake presentation 15 June 2018 page 20).

    Also, around May 2018 Lake has completed some drilling of a project but this was solid rock lithium (listed as large pegmatites in a lake presentation 15 June 2018 page 22). I have not seen any reference for this project since them.
 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
(20min delay)
Last
6.2¢
Change
0.003(5.08%)
Mkt cap ! $102.8M
Open High Low Value Volume
6.0¢ 6.3¢ 6.0¢ $300.6K 4.888M

Buyers (Bids)

No. Vol. Price($)
4 113043 6.2¢
 

Sellers (Offers)

Price($) Vol. No.
6.3¢ 537045 10
View Market Depth
Last trade - 16.10pm 06/05/2024 (20 minute delay) ?
Last
6.2¢
  Change
0.003 ( 3.16 %)
Open High Low Volume
6.0¢ 6.3¢ 6.0¢ 2590872
Last updated 15.58pm 06/05/2024 ?
LKE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.