KPO 13.3% 1.3¢ kalina power limited

Ann: KALiNA Announces Oversubscribed $10 Million Placement, page-58

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 11,251 Posts.
    lightbulb Created with Sketch. 1903
    Ross has already stated that the modular design for geothermal is different to the design for gas plants. They have the concepts for the geothermal but not the detailed and costed engineering plans, they will have those before the end of 2nd quarter 2022.

    Currently KPO has the Saddle Hills 64MW plant nearing FNTP, they also have options to lease two sites suitable for 32MW plants and a further three sites that they have advanced which are suitable for 64MW plants. It also sounds like, from the interview with 180 Markets that they have at least another four projects under consideration.

    Then there is the oil sands company that is looking for WHP, the gas pipeline compression stations and the geothermal project they plan to bid for, which I presume is in the neighbouring province of British Columbia as well as their own 50% owned Klamath Hills Geothermal.

    So quite a lot going on, I’m looking forward to this quarterly due out next week.
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.