Core high grade fence down the center of this is about 250m. Width of holes drilled so far maybe something like 100m. Decent widths. Assume grade gets dragged down by the wider holes. Possible extension with planned holes is another 100m
So far this is looking feasible to be 50koz at mid 1's. That allows trucking costs taking 0.2-0.3g/t off the grade to leave something like 1.2g/t equivalent. Marc recently said that something like this feeding into year 3-4 was worth $50m NPV.
Hopefully the next 15 holes prove up grade and consistency. Would be a nice boost to feaso later in the year when we put out an MRE for Kamperman.
- Forums
- ASX - By Stock
- AAR
- Ann: Kamperman RC Drilling Delivers 35 metres grading 3.81g/t Au
Ann: Kamperman RC Drilling Delivers 35 metres grading 3.81g/t Au, page-3
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $72.94M |
Open | High | Low | Value | Volume |
7.7¢ | 7.8¢ | 7.7¢ | $21.29K | 275.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 13000 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.8¢ | 271916 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 13000 | 0.077 |
3 | 125800 | 0.076 |
1 | 52609 | 0.075 |
1 | 25000 | 0.074 |
2 | 23000 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.078 | 271916 | 3 |
0.079 | 406599 | 4 |
0.080 | 102214 | 2 |
0.083 | 223915 | 1 |
0.085 | 182253 | 1 |
Last trade - 14.02pm 18/06/2024 (20 minute delay) ? |
|
|||||
Last
7.7¢ |
  |
Change
0.000 ( 1.28 %) |
|||
Open | High | Low | Volume | ||
7.7¢ | 7.7¢ | 7.7¢ | 40000 | ||
Last updated 13.49pm 18/06/2024 ? |
Featured News
AAR (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online