I'm a well known contrarian bear, but some bears are real country boys without any sense of decency or decorum.
I traded half out into the MRE worried LIN would juts head south into a mini-Lassonde profit taking period through to 2024, sold another lot at my buy price low 30's, unfortunately held onto a few in case I was wrong and because I like investing in good projects even though on balance they have proven investment losers. LIN was always at risk of a sell down simply because so many were sitting on great profits, and still are at 16c. Being in Malawi and ran by Asimwe (from the little I hear) is not conducive to funds buying in for long term exposure either... so with lots of sellers, traders, manipulators who also read the tealeaves with a plan to get set later cheaper, it was always downhill Lassonde Orphan style without a RE bull market developing (which has demonstrably not).
Todays announcement clearly completes the pivot from marketing Stage 1 demo plant as some sort of cheap, we have the capital for it with some off-take prepayment credit, no feasibility study required just build it and make cash, prove the process etc, etc. I was howled down for saying it looked like cum-raise Lassonde purgatory when I turned up after last CR, and to be fair management communications suggested they were not in the feasibility cum-raise period, but proves they are. Rightly so, it will cost a lot more than the US20M balloon originally floated, they cannot afford to F-it up, won;t raise the capital without a study that accurately estimates the costs and outcome so funds and serious investors will actually get behind LIN with confidence.
I still believe Kanga is a cracking, world class monazite deposit and the met work will prove reliable at very cheap opex. Capex will also be very modest coamperd to many peers, off-take to downstream western monazite processors remains a problematic bottleneck as for all other hard rock wannabe developers. $200M is still not 'cheap' for any undeveloped project whose commodity is in a bear market 9maybe permanent bear market), but Kanga is also one of the very few non-Asian ionic clay insitu mines that can be profitable at these prices. In Australia Kanga would be worth a lot more than $200M even developer cum-raise imo... so what is the Malawi and Asimwe discount?
The best peer analogy I see is SVM, who has a rutile-graphite development project of world class but much higher capex in Malawi, currently in an early stage JV with RIO which may end up with a TO or RIO walking, who knows? SVM has a MC of A$250M with a recent PFS in September and now working towards a DFS which will no doubt drag out and include some pilot plant mine. Under $200M LIN starts looking attractive, especially if you believe RE prices will rise into higher, more sustainable long-term levels.
GLTAH
- Forums
- ASX - By Stock
- Ann: Kangankunde Operations Update
I'm a well known contrarian bear, but some bears are real...
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
-0.001(1.01%) |
Mkt cap ! $112.9M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 9.7¢ | $78.10K | 795.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 199745 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 71486 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 199745 | 0.098 |
2 | 183247 | 0.097 |
2 | 102083 | 0.096 |
1 | 2000 | 0.095 |
1 | 356500 | 0.093 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 71486 | 1 |
0.105 | 740711 | 10 |
0.110 | 490456 | 4 |
0.115 | 167239 | 1 |
0.120 | 243636 | 5 |
Last trade - 16.10pm 17/10/2024 (20 minute delay) ? |
Featured News
LIN (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online