CRR 5.88% 0.9¢ critical resources limited

Ann: Kanuka Lithium Project - Update, page-4

  1. 278 Posts.
    lightbulb Created with Sketch. 33
    All looks pretty good. (though drill results a few weeks off).
    29 holes drilled to date.
    Drilling at Kanuka to finish in a couple of weeks. Have been into pegs most of the way by the sound of it. The main Kanuka peg is widening to the South.
    Auger results indicate lith spod. Diamond drilling to follow.
    Off to Kitolo ASAP afterward.
 
watchlist Created with Sketch. Add CRR (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.001(5.88%)
Mkt cap ! $16.02M
Open High Low Value Volume
0.9¢ 0.9¢ 0.8¢ $2.277K 271.9K

Buyers (Bids)

No. Vol. Price($)
11 9119648 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 3745033 19
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
CRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.