GBE 0.00% 4.0¢ globe metals & mining limited

Ann: Kanyika Project Feasibility, page-52

  1. 1,387 Posts.
    lightbulb Created with Sketch. 208
    Now it is time to implement all the plans that have long been drawn up and available to the government.

    President Chakwera and the TONSE Alliance want and need to deliver and hit the ground running. The pressure and pace is being increased to do so.

    Related to GBE: Consequently, IMO, the signing of the DA will not be long in coming and the CDA, while not currently required by law, will also be largely agreed upon with all stakeholders because it simply cannot and will not work any other way as the community needs answers now, not in the future.

    The pace to implement all upcoming LSM projects, incl. KNP, must be increased. We will see which updates will still result from this.

    All processes will then be affected by the acceleration. The financing topic in particular cannot therefore be dealt with one after the other, but must run in parallel and already be well advanced.

    Financing should not be a problem and as a possible partner, for example, the ADB, African Development Bank Group, should be mentioned, which also sat at the table of various meetings during the SADC Summit, as well as the IMF and World Bank Group.

    IMO, high speed also means: GBE announcements in quick succession with simultaneously increasing SP and a CR, with hopefully as little dilution as possible.
 
watchlist Created with Sketch. Add GBE (ASX) to my watchlist
(20min delay)
Last
4.0¢
Change
0.000(0.00%)
Mkt cap ! $27.65M
Open High Low Value Volume
4.0¢ 4.0¢ 3.7¢ $11.49K 291K

Buyers (Bids)

No. Vol. Price($)
1 103695 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 54314 1
View Market Depth
Last trade - 15.45pm 08/08/2024 (20 minute delay) ?
GBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.