re: Ann: Karibib Lithium Project - First Diam... In the quarterly they wrote that they already drilled
one hole at helicon.
I wonder if that will be also included with the 3 holes pending.
One of the holes is for rubicon 3 and the extra hole 12 that was added after.
Even though the widths were not much i just had a look at the results again and there could be more encouragement considering that hole 7 actually had 2 zones.
Hole 7 36.1m-38.43m,2.33m @ 1.14m Li2O
and 43.44m-44.71m,1.27m @1.11mLi2O
That's 3.60m in one hole
That's why they probably added hole 12.
The trading halt and placement last year was mainly due to Mystique and that's probably still the main focus.
With some results due this week there is still interest in bfe.
The selloff was only about 2m shares so many are still holding and the sp is very elastic.
I also had a look at the EDM quarterly and Predictive is proceeding with exploration with sampling,trenching and mapping in may.
Could still be hope for the options.
- Forums
- ASX - By Stock
- BFE
- Ann: Karibib Lithium Project - First Diamond Dril
Ann: Karibib Lithium Project - First Diamond Dril, page-33
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)