It is "surface stockpiles" ie, it has already been mined and previously considered "waste". JW has indicated in the past that the surface stockpiles (ie this announcement) could be used as the original feed material which would mean the mining costs on the ore is reduced/eliminated.
From the DFS
https://www.lepidico.com/wp-content/uploads/2020/05/update-LPD-200528-DFS-Delivers-Compelling-Phase-1-Project-Results.pdf
Mining is a significant portion of the concentrate cost. Having reduced costs at the start of operations is good for cash-flow during ramp up
- Forums
- ASX - By Stock
- Ann: Karibib Mineral Resource Expanded
It is "surface stockpiles" ie, it has already been mined and...
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.001(33.3%) |
Mkt cap ! $34.35M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $28.74K | 7.766M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
55 | 61590653 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 61142821 | 65 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
51 | 59085140 | 0.003 |
167 | 223014523 | 0.002 |
42 | 161570039 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 52443632 | 60 |
0.005 | 16213086 | 23 |
0.006 | 5720261 | 12 |
0.007 | 5373897 | 7 |
0.008 | 2687232 | 5 |
Last trade - 16.10pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
0.4¢ |
  |
Change
0.001 ( 16.7 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.4¢ | 0.3¢ | 5779342 | ||
Last updated 15.59pm 31/05/2024 ? |
Featured News
LPD (ASX) Chart |