re: Ann: RUM: Karinga Creek Potash Progress R... The projected...

  1. 630 Posts.
    lightbulb Created with Sketch. 1
    re: Ann: RUM: Karinga Creek Potash Progress R... The projected area is substantial but it is not an open water brine lake.

    As noted in the ASX release the key parameter is the recharge rate as water is drawn from pits for processing.

    The easiest way is to start with surface trenches, deeper wells are another option and I imagine even a bore field technique can be considered.



 
watchlist Created with Sketch. Add RUM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.