"Meanwhile a preliminary visual analysis is underway on the drill core for both holes, and will be reported to the ASX together with core photos once the results are available."
Does anyone know how long such a visual analysis would likely take and when we might get this info?
- Forums
- ASX - By Stock
- Ann: Kempfield Drill Plan Strategy Begins To Deliver Results
"Meanwhile a preliminary visual analysis is underway on the...
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARD (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $26.71M |
Open | High | Low | Value | Volume |
1.9¢ | 1.9¢ | 1.8¢ | $109.0K | 5.940M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 3226240 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 722221 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 3226240 | 0.017 |
11 | 1645800 | 0.016 |
6 | 2696000 | 0.015 |
2 | 2070000 | 0.014 |
2 | 268293 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 722221 | 3 |
0.019 | 3425250 | 6 |
0.020 | 3087698 | 9 |
0.021 | 2314361 | 4 |
0.022 | 3871310 | 7 |
Last trade - 11.00am 14/10/2024 (20 minute delay) ? |
Featured News
ARD (ASX) Chart |