Ann: Kennedy Operations Update , page-6

  1. 1,656 Posts.
    lightbulb Created with Sketch. 199


    Adelphi Energy Limited
    Level 4, 679 Murray Street, West Perth, Perth Western Australia 6005
    PO Box 574, West Perth, Western Australia 6872
    Tel: 61-8 9480 1300 Fax: 61-8 9480 1388
    Email: [email protected]
    1 February 2010
    Company Announcements Platform
    Australian Stock Exchange Limited
    Exchange Centre
    20 Bond Street
    SYDNEY NSW 2000
    Via ASX Online
    KENNEDY #1H - OPERATIONS UPDATE
    Adelphi Energy Limited (Adelphi) is pleased to provide the following update on operations
    at the Kennedy #1H well.
    Adelphi has been advised by the Operator, Texas Crude Energy Inc (TCEI), that the isolation
    plugs set as part of the fracture stimulation operations have been drilled out and the well
    commenced unloading at 0100 hrs on Thursday, 28 January 2010 (USCST).
    The initial production rate going to sales at 0700 hrs on Saturday 30, January (USCST) using a
    22/64 choke was 4.39 mmscf/d gas and 1,132 bpd of condensate. The water production rate,
    from the recovery of frac fluids, was 408 bwpd.
    Whilst these initial rates are very encouraging, the following points should be noted:-
    This is an initial production rate during clean up and is not yet indicative of a short or
    long term production profile.
    The well still has considerable fluids to recover from the fracture stimulation operations.
    The well is flowing from approximately 2,200 ft of stimulated Eagle Ford Shale with the
    remainder of the 4,000 ft horizontal liner isolated and not contributing.
    The well is currently producing through the 7" production casing, with a production
    tubing string to be installed in due course.
    Adelphis Managing Director, Chris Hodge commented:
    Whilst it is early days, these initial flow rates are extremely encouraging including the
    expected high condensate ratio. We look forward to seeing how the well cleans up as well
    as the imminent fracture stimulation of our Weston well. Together with the three new wells
    being drilled as part of the farm-in program by Hilcorp across the Sugarloaf AMI, we expect
    to obtain additional valuable production performance data in the very near term to further
    prove up the commercial potential of our interests."
    Adelphi will continue to advise the market on production rates as part of its regular updates
    or as specifically required.
    Adelphi currently (pre-farmout) has a 20% working interest in the Sugarloaf AMI including the
    Kennedy #1well.
    Other ASX listed participants in the Sugarloaf AMI, and their respective pre-farm-out working
    interests are:
    Aurora Oil and Gas Limited 20.0%
    Eureka Energy Limited 12.5%
    2
    For inquiries please contact:
    Chris Hodge, Managing Director or Alex Forcke, Chairman.
    Telephone: +61 8 9480 1300
    Email: [email protected]
    Yours faithfully
    CHRIS HODGE
    Managing Director
    Adelphi Energy Limited
 
watchlist Created with Sketch. Add DXI (ASX) to my watchlist
(20min delay)
Last
$3.01
Change
-0.010(0.33%)
Mkt cap ! $958.1M
Open High Low Value Volume
$3.01 $3.03 $2.99 $81.97K 27.20K

Buyers (Bids)

No. Vol. Price($)
12 4057 $3.00
 

Sellers (Offers)

Price($) Vol. No.
$3.01 314 2
View Market Depth
Last trade - 10.30am 24/06/2024 (20 minute delay) ?
DXI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.