AVQ 0.00% 2.5¢ axiom mining limited

Hi Fuzz I believe most of the Requirements have been Satisfied...

  1. 3,012 Posts.
    Hi Fuzz
    I believe most of the Requirements have been Satisfied by the department,
    the Invitation of the ML some time ago allowed Axiom to submit most of this, as the PL was put aside I believe 31-(1) was also set aside

    d) has already been done and was modified at the request of the Lands department.

    e) was done in 2015 via the 10% jorc which was sufficient to enable the SIG to invite for a ML.

    I) Through to n) is also still current and was completed in 2015......and update was handed in with the New Pl application .
    I would expect a formality for the ML within 1 month of being handed back our PL
    or at least I hope.
    whilst your correct in saying the 90 days for the application process , we have completed all of the requirements necessary to obtain a PL and to be invited to re apply for a ML......Cheers
 
watchlist Created with Sketch. Add AVQ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.