XAM 7.58% 6.1¢ xanadu mines ltd

Ann: Kharmagtai Open Pit Scoping Study Completed, page-5

  1. 72 Posts.
    lightbulb Created with Sketch. 15
    Would anyone take a guess at a conservative cost estimate to get the material from the ground to the crusher?


    Last edited by Janus77: 11/04/19
 
watchlist Created with Sketch. Add XAM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.