XAM 7.58% 6.1¢ xanadu mines ltd

Ann: Kharmagtai Open Pit Scoping Study Completed, page-7

  1. hdg
    18 Posts.
    lightbulb Created with Sketch. 13
    $4.50 USD a tonne would easily cover an all in contractor in Mongolia to get the material to the processor. Anther $1 a tonne should cover camp, admin and other associated costs.

 
watchlist Created with Sketch. Add XAM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.