I would only expect Skip to come back 6 months down the track when the MAT works are complete and there is sufficient drilling/blasting of the powerhouse cavern to know there is reduced geotech risk. SP will slowly drift lower for a while, probably back to 12-14c. My 2 cents.
- Forums
- ASX - By Stock
- Ann: Kidston Pumped Storage Hydro - Construction Update
I would only expect Skip to come back 6 months down the track...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)