I would only expect Skip to come back 6 months down the track when the MAT works are complete and there is sufficient drilling/blasting of the powerhouse cavern to know there is reduced geotech risk. SP will slowly drift lower for a while, probably back to 12-14c. My 2 cents.
- Forums
- ASX - By Stock
- Ann: Kidston Pumped Storage Hydro - Construction Update
I would only expect Skip to come back 6 months down the track...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online