So all geotechnical risk sits with us? That in my view sits under construction risk with an EPC contractor. The JV and Genex via Entura would have to done substantial geotechnical investigations.
This may be considered a variation and hence GNX has to cough up.
- Forums
- ASX - By Stock
- Ann: Kidston Pumped Storage Hydro - Construction Update
So all geotechnical risk sits with us? That in my view sits...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
(20min delay)
|
|||||
Last
27.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $373.9M |
Open | High | Low | Value | Volume |
27.5¢ | 27.5¢ | 27.0¢ | $142.4K | 527.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 10813157 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.5¢ | 4922936 | 41 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 10813157 | 0.270 |
26 | 11573078 | 0.265 |
2 | 6600 | 0.260 |
2 | 41970 | 0.255 |
1 | 10000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 4922936 | 41 |
0.280 | 2201148 | 16 |
0.285 | 98506 | 5 |
0.290 | 106355 | 6 |
0.295 | 124962 | 2 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
GNX (ASX) Chart |