Thx jezyh - I've just read the IAR and see the planned solution for discharge of excess water from the pits is dilution, ie. releasing controlled quantities once water flow in the nearby river exceeds a specified volume. No water treatment of discharge water mentioned.
Does anyone know how acidic the water in the pits is and whether GNX plan to treat the water in the pit to reduce acidity or is the hydro pump spec'd to withstand pumping acidic water?
FYI - after being exposed to air and water, oxidation of metal sulfides (often pyrite, which is iron-sulfide) within the surrounding rock and overburden generates acidity.
- Forums
- ASX - By Stock
- Ann: Kidston Pumped Storage Hydro - Project Update
Thx jezyh - I've just read the IAR and see the planned solution...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
(20min delay)
|
|||||
Last
27.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $373.9M |
Open | High | Low | Value | Volume |
27.0¢ | 27.3¢ | 27.0¢ | $263.9K | 977.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 11173627 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.5¢ | 5037239 | 38 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 9673627 | 0.270 |
24 | 11549328 | 0.265 |
3 | 9600 | 0.260 |
2 | 41970 | 0.255 |
1 | 10000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 4769239 | 35 |
0.280 | 2181148 | 15 |
0.285 | 3170 | 2 |
0.290 | 102719 | 5 |
0.295 | 124962 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
GNX (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online