Thank god KKO has finally got rid of one of their two-bit agreements.
Vutomi was always an ANC black-elite shell, and just like everything ANC-related, they are useless and would never have generated a watt of electricity.
I have said repeatedly that this pilot electrical project was dead straightforward;
a) Hire a containerized 1MW unit and dump it in the paddock
b) Hire a switchboard/transformer container and dump next to it.
c) Connect the wells with low pressure piping and attach to a containerized gas scrub module dumped next to the others.
d) Connect to the adjacent HV electricty lines and switch it on.
A WA minesite would have sorted this in a couple of months - JUST DO IT!
And while you are about it, cancel that two-bit agreement with FFS - they are out of their depth and will probably not deliver either.
From now on focus on agreements with significant parties like Sasol and Eskom directly - we are on their doorstep, after all!.
- Forums
- ASX - By Stock
- Ann: KKO Installation of Pilot Genset at Amersfoort Project
Thank god KKO has finally got rid of one of their two-bit...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
0.001(1.35%) |
Mkt cap ! $107.4M |
Open | High | Low | Value | Volume |
7.5¢ | 7.5¢ | 7.5¢ | $1.875K | 25K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 25000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.071 |
2 | 44270 | 0.070 |
1 | 50000 | 0.066 |
1 | 200000 | 0.064 |
1 | 200000 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 25000 | 1 |
0.085 | 4790 | 1 |
0.090 | 100000 | 1 |
0.094 | 225000 | 1 |
0.100 | 143623 | 3 |
Last trade - 10.04am 26/07/2024 (20 minute delay) ? |
Featured News
KKO (ASX) Chart |