EEL 0.00% 0.3¢ enrg elements ltd

Ann: Kopore to accelerate exploration in Namibia, page-2

  1. 35 Posts.
    NAMIBIAN DATASET TO ACCELERATE
    EXPLORATION TARGETING
    HIGHLIGHTS
    • Kopore acquires geological dataset from Namibian Ministry of Mines
    and Energy which allows exploration targeting on newly acquired
    Namibian prospecting licences to be fast-tracked and reduce initial
    exploration costs
    • Allows Kopore to immediately refine exploration targets which will
    benefit the Company as currently the largest prospecting licence
    holder in the Kalahari Copper Belt
    • Latest information to be immediately integrated into Company’s
    database to deliver contiguous dataset with existing Botswana assets
    • Environmental clearance certificate (ECC) program initiated in
    Namibia, with anticipated completion expected late Q4 2018
    • RAB and RC drilling program continues at the Botswana KM3
    Prospect
    Kopore Metals Limited (“Kopore” or “Company”) is pleased to provide the
    following update on its eight Namibian prospecting licenses (EPL’s) covering
    5,705km2 over the emerging Kalahari Copper Belt (see Figure 1).
    The Company was recently granted access by the Namibian Ministry of Mines and
    Energy to substantial sets of archived historical reports and data, covering its
    Namibian prospecting licenses. A newly received additional set of information has
    provided the Company with an accelerated path to identifying and refining
    exploration prospects and further optimising targeted exploration expenditure (see
    Figure 2).
    The eight Namibian prospecting licences cover potential copper-silver prospects
    with two types of regional interpreted structures, comprising domal limbs and
    potential intact subsurface domes within the licence areas (see Figure 3).
    Kopore continues to work to fast-track its Namibian exploration program definition
    stage to align this with the Company’s Botswana Projects as the Company
    progresses through its respective drilling programs. The Company has initiated
    its required Environmental Clearance Certificate (ECC) program over the
    Namibian license areas, with anticipated completion in later Q4 2018.
    “This newly received additional information will assist the Company in fast-tracking
    our Namibian exploration targeting phase and allowing the Company to utilise its
    exploration expenditure more effectively. We look forward to providing further
    information on our Namibian prospects and planned exploration programs.”- said
    Kopore Managing director Grant Ferguson.
    As announced1
    , the Company is continuing its maiden rotary air blast (RAB) and
    reverse circulation (RC) drilling, comprising an initial 3,000 metres across the
    Company’s identified copper anomalies at KM3 and GW3 Prospects.
 
watchlist Created with Sketch. Add EEL (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $2.525M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $2.519K 1.006M

Buyers (Bids)

No. Vol. Price($)
32 23683839 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 660333 1
View Market Depth
Last trade - 14.23pm 21/06/2024 (20 minute delay) ?
EEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.