I think people are forgetting that this is just a base/worst case scenario that sets the baseline that even without all of the upside to come, just Korbel main is viable. My favourite part of the SS (haven't read properly yet) is the sensitivity analysis. Look at the enormous impact of just a 10% increase
in grade or gold price would have on NPV. This SS doesn't include RPM which we know has significantly higher grades and could radically change these economics (RPM will be included in the PFS which is now underway). It is also inevitable that there is more gold just at Korbel main (let alone Korbel valley and all of the other prospects).
- Forums
- ASX - By Stock
- Ann: Korbel Gold Project Starter Pit Scoping Study
I think people are forgetting that this is just a base/worst...
-
- There are more pages in this discussion • 367 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.005(3.23%) |
Mkt cap ! $38.96M |
Open | High | Low | Value | Volume |
15.5¢ | 16.0¢ | 15.5¢ | $40.76K | 260.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 20036 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 0.155 |
4 | 141834 | 0.150 |
4 | 175742 | 0.145 |
3 | 420000 | 0.140 |
2 | 27000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 20036 | 1 |
0.175 | 10000 | 1 |
0.180 | 37701 | 4 |
0.185 | 5555 | 2 |
0.195 | 104995 | 2 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online